|
The digging begins |
We have been living on a building
site for the last few weeks. Our house is situated halfway down a road in the village and
unfortunately for us is at the lowest part of that road. When it rains
we often find the car splashing around in a small lake and during a downpour we
sit patiently with rolled up towels wondering if this will be the time it
begins to flow into the house. Watching the sewers turning into a bubbling
fountain is not much fun either.
|
Adding drainage stones to the soak-away |
It has taken many years of
planning, surveying and clever use of the village budget, but finally the work
to manage the rainwater flow has now been carried out. The square of grass between
our house and the road was removed and a 100m3 soak-away has been dug out and
filled with drainage stones. Pipes and drains have been dug into the sides of
the road and curb gutters laid. The road surface was then removed to ensure it
is now level, but with the correct camber to encourage the water to flow in the
right direction.
|
The soak-away |
It was fascinating to watch and I
really couldn’t fault the work team. They put in long days where they barely
took a break, except for their lunch, which was a real French lunch. The first
thing on site was their caravan/staff room, complete with a rather large busted
beauty hanging on the wall inside, and every lunchtime a generator was fired up
and lunch was cooked on site. There was no loud music, no raised voices, it was
all very civilised, just the clatter of cutlery and crockery and the chatter of
happy colleagues.
|
Rainwater drainage system |
The topsoil that has replaced the
grass patch initially looked like it would make a superb overflow potager and I was about to suggest to the Maire I
would happily fill it with courgettes (zucchini). However as it is only a very
thin layer, I don't think the courgettes would have been very happy, but my second suggestion of a wild flower meadow seems to have been
accepted, so fingers crossed. Whatever is decided by the council in the long term needs to be a low cost project that is also
low maintenance, but looks better than the bare earth.
|
Ready to become a wildflower meadow |
|
The road surface eating machine and red tipper lorry |
The day the old road was eaten, we
escaped out the back door with the dog and wandered out of the village for a
few kilometres before heading up a white farm track. The peace and quiet of a
warm spring day was shattered as around a bend in the track came a huge red
tipper lorry that we recognised from the road works. A little further up we
discovered carefully tipped piles of our road. With a bit of spreading out and
tamping down the farm track will have a fresh new surface, cleverly recycled
from our old road, all except the very small piece we took home as a souvenir. Waste not want not, as the saying goes, no matter how big the project.
|
The old road recycled |
|
A fab bit of kit lays the new road surface |
Peace and quiet has again
replaced the hum and clank of machinery, the caravan has moved on to the next
project and although it is great to be able to get the car back to the front
door again I am kind of missing the daily buzz of activity that was going on
outside.
No comments:
Post a Comment
Please don't be shy, I love to hear from you.